Retour à la recherche
1A
1x1 architecture inc.Source d’offres vérifiée

Kildonan Park Maintenance Building

Offre en anglais

Maintain the grounds and facilities of Kildonan Park, including the use of garage and wash bays. Support the operations of park amenities such as the open-air theatre and swimming pool.

  • Sur place
  • Winnipeg, MB
  • Publié 3 août 2026
  • Postuler avant le 2 sept. 2026
  • 1 poste

Résumé du poste

Established in 1909 Kildonan Park is one of several regional parks in the City of Winnipeg. Designed by George Champion, the 96 acre (39 ha) public amenity is home to the dramatic open-air theatre Rainbow Stage, Peguis Pavilion, swimming pool, and numerous outdoor recreational areas. The Kildonan Park Maintenance Building was designed to consolidate a collection of buildings housing a variety of functions required for maintaining the park grounds and facilities. The building features three large garage bays, including one that doubles as a wash bay, a large staff area with change rooms and a lunch/meeting area. There is ample space to accommodate both permanent park staff as well as a large compliment of seasonal employees. An exterior universal washroom serves the park patrons. The building frames the traditional English garden on the west side of the park. A dark vertical reverse board-and-batten cladding compliments the lush greenery of the park's natural vegetation. The large fascia of the roof mimics other modernist buildings throughout the park while the angular overhangs create dynamic shadows at the primary entrance to the building. Client: City of Winnipeg Type:Industrial Construction Value: 1.7M Date of Completion: May 2019 Area: 4,950 sq.ft. (460 s.m.) Consultant Team Prime Consultant: 1x1 architecture inc. Structural: Crosier Kilgour & Partners Ltd. Mechanical: Nova 3 Engineering Ltd. Electrical: Nova 3 Engineering Ltd. Civil: Sison Blackburn Consulting Inc. Photography: Lisa Stinner-Kun Filed under Industrial

Ce que vous ferez

Maintain the grounds and facilities of Kildonan Park, including the use of garage and wash bays. Support the operations of park amenities such as the open-air theatre and swimming pool.

Exigences

The role is listed as entry-level within the management and manufacturing function. Candidates should be able to work in an industrial construction and maintenance environment.

Autres compétences pertinentes

Relevées dans la description du poste. Confirmez les exigences importantes ci-dessus.

  • Facility Maintenance
  • Industrial Construction
  • Park Management
  • Building Operations

Domaines d’emploi

  • Construction
  • Government & Public Sector
  • Trades
  • Sports & Recreation
  • Management & Leadership

Renseignements supplémentaires

Expérience minimale
0+ ans
Postuler avant le
2 sept. 2026
Langue de l’offre
anglais
Heures de travail
40 heures par semaine
Niveau d’expérience
Entry level